info@yanvic-minerals.com
Testwork & Engineering

Testwork & Engineering

Every successful concentrator starts in the laboratory and on the drawing board. That is where we start with you.

Metallurgical Testwork

Know your ore before you build the plant

Our testwork programs quantify how your ore breaks, separates and dewaters — the data behind every sound equipment selection and flowsheet decision. Programs scale from a 20 kg orientation sample to multi-tonne pilot campaigns, with reports formatted for engineering and financing.

Commission a test program
Metallurgical test laboratory

Comminution Testing

  • JK Drop Weight Test (A×b, ta)
  • SMC Test® for SAG mill modelling
  • Bond ball / rod mill work index
  • Abrasion index (Ai) testing

Separation Testing

  • Gravity separation (table, jig, spiral, centrifugal)
  • Low / high-intensity magnetic separation
  • Bench & locked-cycle flotation
  • Heavy liquid & DMS amenability

Pilot & Semi-Industrial Trials

  • Continuous pilot plant campaigns
  • Semi-industrial scale validation
  • Bulk sample processing
  • On-site industrial trials

Analysis & Reporting

  • Process mineralogy & ore characterization
  • Chemical & size-assay analysis
  • Flowsheet development & mass balance
  • Bankable testwork reports
Mineral processing plant engineering
Plant Design & Engineering

Engineering that survives commissioning

From a crushing station that must move with the pit to a full concentrator on a greenfield site, our engineers design for operability first: maintainable layouts, correctly sized equipment and circuits verified by simulation — not rules of thumb.

Discuss your project

Semi-Mobile Crushing Stations

Modular, relocatable crushing stations that cut civil works and follow the mine plan — from feasibility layout to fabrication drawings.

JKSimMet Circuit Simulation

Comminution circuit modelling with JKSimMet: mill sizing, throughput forecasting and liner / operating optimization before you spend on steel.

Equipment Selection

Independent, testwork-based selection and sizing of crushers, mills, screens, cyclones and dewatering equipment — with duty-point guarantees.

Concentrator Design

Process design criteria, PFDs, mass & water balances, general arrangement and 3D plant layout for new plants and brownfield upgrades.

How We Work

From sample to signed-off plant

Sample receipt → test plan → laboratory program → report & flowsheet → engineering → equipment supply → commissioning support. One team carries your data through every stage, so nothing is lost in translation.

Mill manufacturing

Tell us about your ore — we will engineer the answer.

Send us your ore samples, drawings or equipment list. Our engineers reply within 24 hours with a technical proposal and budgetary quotation.

Request a Quote